Almost but not quite. I have to add covering to the cockpit panels. I have cleaned up the entire inside interior edges not seen in these pictures because I forgot to take them. The video will be loaded later and shows the tidy up. All circuits and wiring is now hidden behind nice ABS panels. Light leaks gone and gapped. Top bubble tinted red and lighted. Locker doors in the corridor are built and installed. Paint job finished. Another two hours tomorrow to install the girders and a one last look over and it should be good to ship! See ya tomorrow.
We just got a new commission to build a super detailed and lighted D.
Oh sweet, the clear -D. I’m looking forward to that. 😀
The Spindrift is looking stunning. I love the dome. Everything is looking so awesome. After two years, it’s so badass to see this getting done. I can’t wait for the video. 😀